Below is a list of documents and evidence included in this Portfolio of Evidence to support the work completed during the installation of PVC sheathed, conduit, and Trunking systems:
Signed attendance sheets
Logbook entries showing participation in practical sessions
Trainer/instructor signatures confirming activities completed
Marking guides from instructors
Assessment rubrics for wiring, installation, and testing tasks
Competency checklists indicating achieved skills
Hand-drawn or computer-generated wiring diagrams
Layout sketches of trunking, conduits, and cable routes
Schematic diagrams showing circuit flow and connections
Bill of quantities listing cables, trunking, conduits, fittings, and accessories
Tools used during installation (with pictures if required)
Written descriptions of installation tasks
Photos showing the starting point, progress, and completed work
Notes on measurements, fixing methods, and cable routing decisions
Risk assessment forms
PPE checklist
Workshop safety guidelines and signed compliance forms
Continuity test results
Polarity test results
Insulation resistance readings
Instructor’s evaluation notes
Notes on any faults identified
Records of corrections made
Troubleshooting procedures followed
Personal reflections on what was learned
Challenges faced and how they were solved
Skills gained from the installation tasks
Trainer’s remarks on performance
Sign-off page confirming successful completion
Certificates earned